Featured Projects

Freddy’s Frozen Custard & Steakburgers, Mt. Vernon, IL

Franklin County Courthouse, Benton, IL

 

Pinckneyville Community Hospital, Pinckneyville, IL

This new hospital is a 90,000 square foot facility with 17 medical-surgical beds and emergency services capability.  This project included electrical construction from the ground up with lighting design, lighting controls, security controls, nurse call controls, fire alarm systems and helipad lighting.

Senior Life Solutions Center
Pinckneyville Community Hospital, Pinckneyville, IL

This new center consists of a reception/waiting area, offices, meeting/activities rooms, general use area, kitchen and restroom facilities.  It is located adjacent to the new Pinckneyville Community Hospital.

Aquatic Zoo, Mt. Vernon, IL

The Aquatic Zoo in Mt. Vernon, Illinois is an amazing 10 acre outdoor aquatic complex that includes a lazy river, body and tube slides, lap pool, splash pad, concession/restroom building and parking area.  Outdoor lighting was an important part of this project as well since the Aquatic Zoo has evening events throughout the summer.

Continental Tire of the Americas, Mt. Vernon, IL

This 220,000 square foot Warehouse Addition features three warehouses under one roof.  The 7,600 square foot Rework Center Expansion and 20,100 square foot PLT Building Expansion are also recent projects completed at this manufacturing facility.  Clinton Electric, Inc. regularly performs electrical construction work for expansions, renovations, equipment installations, plant shutdown and emergency situations in this manufacturing facility and many others in southern Illinois.

Southeastern Illinois Electric Cooperative Headquarters, Harrisburg, IL

The new corporate headquarters for the Southeastern Illinois Electric Cooperative is a 70,000 square foot complex that includes an administrative office, warehouse, maintenance and vehicle storage buildings as well as a fueling station.  Installation of LED lighting and structured wiring were major components of this new construction.

Murphysboro Waste Water Treatment Plant, Murphysboro, IL

This waste water treatment complex serves a city of 8,000.  The project included installation of two 120′ diameter aeration tanks, two 76′ diameter clarifier tanks, two 58′ digester tanks, a pump station, a main control building, filter building and maintenance/storage building.  Clinton Electric, Inc. provided power by installing a 1600 amp service and 800 kw generator.  Integrated wiring for various systems including SCADA and fire alarm was installed.

Central Christian Church Renovation/Addition,
Mt. Vernon, IL

This 22,000 square foot renovation and addition includes a central reception/check in area, refreshment area and multiple classrooms.  Lighting plays a major role in getting the industrial warehouse vibe that Central Christian Church chose for their Kids Depot.

Benton Event Gymnasium, Benton, IL

This 21,600 square foot gymnasium and event center provides the school and community a brand new venue for hosting both sports and community/stage events.  The gymnasium features seating for 500, a large stage area, lobby/concession area and restrooms.  Beautiful LED lighting was installed throughout the complex as well as lighting control and fire alarm system.